Suzhou City Sawers Hydraulic Lifting Machinery Co., Ltd.
0512-66800819
0512-66800289
In the previous aerial work; Ladder’ Or‘ Scaffold’, Due to the immature science and technology, aerial work is not only difficult but also unsafe. Now there is a hydraulic lift, which can rise to tens of meters in an instant by just pressing a button. In the field of aerial work, hydraulic lifts can be called climbing‘ Advanced weapons’, So where is its advancement reflected? Why is it so popular in the market?
First, compared with other climbing equipment, hydraulic elevators are more environmentally friendly. Zero emission and low noise, which undoubtedly conforms to the call of low-carbon and environmental protection in today's era and is supported by customers.
Secondly: heavy load and convenient movement. The machine body is mainly lifted by hydraulic system, so the load capacity can reach tens of tons. In addition, the equipment can move flexibly, so the limitation is small.
Moreover: it saves time, labor and efficiency. In today's society, people are used to working efficiently, and hydraulic elevators achieve this goal. People can send people to tens of meters high for work with a simple press, which is safe and secure.
Finally: the classification of hydraulic lift is more, and has ornamental value. It can be used for aerial work at any time and can be viewed at the mall or exhibition hall because of its beautiful appearance, fine workmanship, ornamental value and low-key elegance.
Conclusion: Now is the era of science and technology. Hydraulic elevators have always occupied an advantage in the high-altitude field, mainly due to its advanced nature. Suzhou Sawers Hydraulic Lifting Machinery Co., Ltd. has been committed to the production and sales of elevators and electric lifting platforms for a long time, and hopes to reach cooperation with more ambitious people. Suqian Antong Lifting Platform - Installation Preparation Conditions for Hydraulic Lifting Platform“ Four Steps”.
1. Allocation of installation personnel The installation personnel of the elevator include fitters, electricians and general workers. The number of personnel is determined according to the number of elevator, installation period and other actual conditions. The installation personnel shall receive special technical training and work with certificates. The installation team has a team leader who is responsible for the planning, organization, coordination, security and other work of the installation, and controls the construction period.
Suzhou Saworth Hydraulic Lifting Machinery Co., Ltd. specializes in manufacturing various cargo lift hydraulic lifting platforms Aerial work platforms Hydraulic boarding bridge unloading platforms
2. Before the installation of the construction period schedule, the installation team leader shall prepare the construction period schedule according to the workload, contract construction period requirements and site conditions. After the installation is carried out normally, strictly follow the construction period schedule to ensure the installation duration and quality. Suzhou Sawers Hydraulic Lifting Machinery Co., Ltd. specializes in manufacturing various cargo lift hydraulic lifting platforms, aerial working platforms, and hydraulic boarding bridges
3 Pit/hoistway preparation In order to ensure the smooth installation of the elevator, the installation director must know the relevant information of the pit/hoistway at the installation site in advance, ask for the schematic diagram, and understand the relevant data, such as floor height, hoistway clearance size, pit depth, top floor height, corbel size, embedded iron position size, reserved hole position size, machine room height, hook position, etc. If it is found that the relevant dimensions are inconsistent with the installation requirements of the cargo lift, it shall communicate with the customer in a timely manner and correct within a time limit.
Suzhou Sawers Hydraulic Lifting Machinery Co., Ltd. specializes in manufacturing various cargo lift hydraulic lifting platforms, aerial working platforms, and hydraulic boarding bridges
4 The scaffold shall be erected according to the requirements of the scaffold drawing and the hoistway drawing of the elevator machine room to avoid friction with hoistway components, such as guide rails, sills, wiring ducts, etc. Scaffolds must be firm and safe. Generally, more solid metal components shall be used instead of wood or bamboo.
The following principles shall be followed for enterprise power consumption
Suzhou Sawers Hydraulic Lifting Machinery Co., Ltd. specializes in manufacturing various cargo lift hydraulic lifting platforms, aerial working platforms, and hydraulic boarding bridges
1. Relevant national laws, regulations and standards must be strictly observed, and the requirements of relevant procedures must be observed. Relevant national policies and guidelines must be implemented, such as saving non-ferrous metals, using low energy consumption equipment to save energy, etc. Suzhou Saworth Hydraulic Lifting Machinery Co., Ltd. specializes in manufacturing various types of cargo lift hydraulic lifting platform aerial work platform hydraulic boarding bridge
2. The overall design scheme must be reasonably determined based on the power supply planning of the whole region and the power capacity according to the level of compliance. Suzhou Saworth Hydraulic Lifting Machinery Co., Ltd. specializes in manufacturing various cargo elevators, hydraulic lifting platforms, aerial working platforms, and hydraulic boarding bridges
3. The design shall ensure reliable power supply to ensure the safety of personnel and equipment. The power supply quality shall be qualified, economical and reasonable, and the technology shall be advanced. More advanced equipment and technology with low energy consumption and high efficiency shall be used as far as possible. Suzhou Sawers Hydraulic Lifting Machinery Co., Ltd. is specialized in manufacturing various cargo elevator hydraulic lifting platforms aerial work platforms hydraulic boarding bridges
4. The long-term and short-term construction planning of the project should be correctly handled according to the planning of the whole project, and the possibility of expansion should be properly considered.